One Model. Every Step. Every Deliverable.

Build the model once. Create value from it throughout the project.

The same connected structural model moves through design and data migration, connection design and detailing, checking, estimating, coordination and tracking. Each stage builds on the work completed before it, reducing duplicate effort, improving data quality and maintaining continuity from design through construction.

  • Save Time

  • Improve Quality

  • Control Cost

  • Reduce Risk

One Model. One Workflow. One Source of Truth.

The six stages

  1. DESIGN

    Move Data. Not Rework.

    Save time. Preserve project intelligence. Move across BIM platforms without starting over.

    • BIM Data Migration

      Move model data between BIM platforms while preserving the information already created. Reduce manual recreation, avoid data loss and maintain continuity as projects move between different BIM environments.

    Includes Design Documents and Design Model.

    Business impact
    Less re-entry. Less data loss. Less rework. Faster project setup. Better data continuity.
  2. Auto CONNECT

    Connect Faster. Standardize. Automate.

    Turn proven engineering and detailing knowledge into repeatable automation, reducing repetitive work while improving consistency and quality.

    • Auto connected BIM

      Connection detailing consumes significant project time. VIRTUELE automates repetitive connection workflows and applies predefined connection criteria across the model, allowing teams to focus their expertise on a smaller group of connections that require engineering judgment.

    • Steel Connection Libraries

      A connection resolved once should not have to be resolved again. Build and maintain libraries of proven, compliant steel connections that can be reused across members, models and future projects.

      Over time, project knowledge becomes reusable digital intelligence rather than work that must be recreated on every project.

    • Fabrication Requirements

      Maintain consistency in fabrication with pre-set shop standards. VIRTUELE’s solution enables adherence to both project specifications and shop standards, reducing rework and ensuring high-quality outputs.

    Business impact
    Faster detailing. Greater consistency. Less repetitive work. More capacity with the same resources.
  3. Auto CHECK

    Find It in the Model. Not in the Field.

    Catch problems earlier, when they are faster, easier and less expensive to correct.

    • Model Check

      Problems discovered during fabrication or erection are expensive problems. VIRTUELE checks the model earlier for constructability, coordination and model-quality issues so teams can resolve them before they become RFIs, rework, delays or field changes.

    Includes Prechecks and Early Issue Detection.

    Business impact
    Fewer surprises. Less rework. Better quality. Lower project risk.
  4. ESTIMATE

    Estimate. Compare. Learn. Improve.

    Create faster estimates, validate them against what was actually built, and continuously improve estimating accuracy.

    • 3D Estimate AI

      Estimate directly from the design drawings or a structural model using a connected dataset instead of repeatedly measuring and recreating project quantities.

      But estimating doesn't stop when the project is awarded.

      VIRTUELE lets teams compare the estimation model with the as-built model, providing a retrospective view of where quantities, assumptions and scope changed between estimate and construction.

      Use what actually happened on completed projects to improve the next estimate, turning historical project performance into estimating intelligence.

    • 2D Estimate AI

      Start from the PDF drawing set alone. AI reads the grid and the members from every sheet, your estimator approves them, and VIRTUELE builds a 3D model to weigh, check and export to IFC.

    • MTO Reports

      Generate material takeoffs directly from the model and compare revisions as the design evolves. Understand what changed, quantify its material impact and identify cost implications before those changes become downstream surprises.

    Business impact
    Faster estimates. Better quantity control. Continuous learning. Greater estimating accuracy. Better margin control.
  5. COORDINATE

    One Project. One Source of Truth.

    Keep models, drawings, RFIs, documents and decisions connected so teams spend less time searching and more time moving the project forward.

    • Document Management

      Keep project documents, drawings and markups connected to the same project environment. Reduce version confusion and give teams confidence that they are working with current information.

    • RFI Management

      Put the question where the problem actually exists: in the model. VIRTUELE connects RFIs directly to affected geometry so the question, response and impacted members remain together.

      That context helps engineers, contractors, detailers and fabricators understand issues faster and make informed decisions.

    • Drawings

      Manage drawings in one environment, control distribution and connect drawings with the model views, revisions and RFIs that explain them. Keep the latest information accessible throughout the project.

    • Document Markups

      Review directly on 2D PDFs using industry-specific annotations, weld symbols, notes and electronic stamps. Keep review intent on the drawing instead of scattered across emails and disconnected communication.

    Includes Change Orders.

    Business impact
    Faster decisions. Fewer communication gaps. Better revision control. Less project friction.
  6. TRACK

    See Where the Project Stands. Right Now.

    Turn connected project data into visual control over progress, schedule and delivery.

    • Project Status Tracker

      See project status directly in the 3D model instead of relying solely on manually maintained spreadsheets and disconnected reports.

      Color-coded visualization shows where members are in the project workflow, helping teams understand progress, identify bottlenecks and act before downstream activities are affected.

    Includes Approval Status, Fabrication Status and Erection Status.

    Business impact
    Real-time visibility. Better schedule control. Earlier intervention. More predictable delivery.